MASTER PLAN DEVELOPMENT
HERITAGE TREE STAND DELINEATION PLANS
This massive project was largely accomplished in house by Horizon Design and many weeks of data collection, drafting and work on calculations went into the final development of plans. The very large site consisted of thousands of trees and site surveying was a large part of the work. compiling the data in an organized manner was of the utmost importance.
These were the critical design elements included on the project:
1. On-site data collection and tree surveying
2. Logging tree information and using GPS to locate heritage trees.
3. Collaboration with Civil Engineers to develop the site, determine appropriate trees to save or remove.
4. Draft plans with extreme accuracy and attention to detail.
5. Calculate tree removal and tree replacement